← Consulting · PACE examples · Part 90 samples
DeliverablesWhat paid engagements produce
Anonymous, redacted samples — same document types as Assessment and Integrated Design tiers. Not templates you can copy verbatim; illustrations of depth before you book a discovery call.
Property: Multi-building estate · ~40 acres · East TN
| Layer | Method | Who | Trigger |
|---|---|---|---|
| Primary | Cell + Starlink voice | All staff | Normal operations |
| Alternate | GMRS mobile + programmed HT fleet (Ch 3–7) | On-property staff | Cell degraded >15 min |
| Contingency | 2m ham net via base vertical; Meshtastic text between buildings | Licensed operators + gate house | GMRS repeater unavailable |
| Emergency | HF Winlink welfare + satellite messenger to off-site manager | Designated liaison (Extra) | All local RF + data failed 1 hr |
Includes: 72-hour power budget for field radios, drill schedule (quarterly tabletop + annual full-failover), and ICS-205-aligned channel naming. Built from PACE planner framework.
Staff pocket reference — programmed memories
| Label | Service | Use | Tone |
|---|---|---|---|
| STAFF-1 | GMRS | Property simplex — buildings A–D | *** |
| STAFF-2 | GMRS | Vehicle mobile simplex — north ridge route | *** |
| EMERG | Ham 2m | County ARES net (listen first) | *** |
| WX-D7 | GMRS | SKYWARN District 7 training net | *** |
Full cards include PL/DCS, offset, power level, and “do not use for” notes. Frequencies match regional data at time of delivery; clients receive update procedure.
Check-in when Primary fails
- Property manager announces failover to Alternate on STAFF-1 (GMRS simplex) within 5 minutes of cell loss.
- Each team lead checks in: name, location, headcount, immediate needs — max 15 seconds.
- Gate house logs check-ins on printed ICS-211 roster; Meshtastic confirms text if GMRS marginal.
- If no check-in within 20 minutes, Contingency: 2m net per channel card; Emergency path at +60 minutes.
- Quarterly drill uses tabletop outline — measured: Alternate contact in <4 minutes (client benchmark).
ROI framing: A $2,500 Assessment typically surfaces $3,000–$8,000 in redundant gear spend, licensing gaps, and single-point-of-failure risk before you buy another drawer of radios. Integrated Design replaces guesswork with tested channel plans and staff procedures your team can run without the consultant on site.